ACTON TOWN HALL

The Acton Town Hall regeneration project seeks to provide new and improved leisure, library, community and civic facilities. The site improvements are needed because the population of Acton has grown progressively since 1900, when the Town Hall was built. All the buildings are undergoing significant repair aimed at reducing the high cost of maintenance.

G and D Higgins of Harrow installed the ATLANTIC MULTI-ELEC 315kW as it easily overcame site problems of access and availability of services. Needing no flues, the powerful, over 99% GCV efficient boiler fitted snugly into a basement area. Requiring only electrical energy supplies, shortage of adequate natural gas was speedily overcome. The boiler has a three-step control system controlled in steps or by a building management system.

The Multi-Elec is available ex-works, from 96kW to 630kW and, by special manufacture up to 980kW. Range of temperature is 40°C to 95°C, and working pressure 0.5BARS to 4.0BARS.

View Product